Effective January 2023
Billing Title | Regular Time Hourly Rate (8:00 a.m. to 4:00 p.m., Monday through Friday) | Overtime Hourly Rate (all non-regular hours, including Town observed holidays) |
---|---|---|
Commissioner of Public Works | $200 | $300 |
Deputy Commissioner of Public Works | $175 | $263 |
Town Engineer | $165 | $248 |
GIS Coordinator | $160 | $240 |
Senior Engineer | $150 | $225 |
Assistant Engineer | $140 | $210 |
Principal Engineering Technician or Junior Engineer | $130 | $195 |
Environmental Scientist Technician | $130 | $195 |
Engineering Technician | $125 | $188 |
Survey or GPS Crew | $225 | $335 |
Consultant/Town-Designated Engineering Firm | Per firm's current contract rate + 10% admin. fee | Per firm's current contract rate + 10% admin. fee |
Water Distribution System Computer Modeling Fees | |
---|---|
Desktop Fire Flow Availability Review | No Charge |
Hydraulic Model Simulation Fee | $1,750 |
Hydraulic Model Fee - Subsequent model runs, including Mitigation, as needed | Accrual basis per approved hourly rate |
Major and Minor Subdivisions, Land Divisions, Lot Line Revisions, Resubdivisions, Rezoning, Plan Development Districts, Site Plan and Special Use Permit Review Fees | |
---|---|
Application Fee | $150 |
Review and Approval Fees | Accrual basis per approved hourly rate schedule |
Mixed Economic Development District Review Fees | |
---|---|
Reviews of all master-planning documents will be completed on an accrual basis using the approved hourly rate schedule. In addition, fees associated with the review of land subdivisions, special use permit or site plan applications based on the approved fee for each of those individual actions, as listed above. |
Water, Sewer, Drainage, and Special Assessment District Review Fee | |
---|---|
Review Fee | Accrual basis per approved hourly rate schedule |
Inspection Fees for Public Improvements/Infrastructure | |
---|---|
Accrual basis per approved hourly rate schedule |
Stormwater Management, Grading and Erosion and Sediment Control | |||||||
---|---|---|---|---|---|---|---|
Review Fees: | |||||||
Grading, Erosion and Sediment Control Review for residential construction including Pool and Demolition Projects (w/ Building Permit Application) | $200 | ||||||
Grading, Erosion and Sediment Control Permit | |||||||
| |||||||
Inspection Fees: (as required for compliance with Town Grading Code and Stormwater Law) | |||||||
| |||||||
Note: If Construction Compliance Field Inspection or Violation Follow-up Inspection is completed by a Town Designated Engineering Firm, inspection fees shall be at firm’s current contract rate for the actual hours worked and expenses, plus 10% for administration. |
Service Charges | |
---|---|
A service charge of 1.5% per month for balances due after 30 days. |